France – La Défense
Organisation : Icade - Esset Property Management
The main actions implemented to reduce the energy consumption of this building.
Progressive replacement of the building management systems (BMS) installed in 1998.
Adjustment of heating and cooling controls: no heating or cooling production when outdoor temperatures are between 16°C and 21°C; adjustment of the control thresholds from +3°C/−3°C to +2°C/−2°C.
Optimisation of the water loop to recover heat from the more exposed façades, alongside optimisation of the water temperature control curve.
Optimisation of chilled water production and storage: storage at night and release in the morning.
Optimisation of water treatment.
Engagement of building teams—including security, fire safety, technical maintenance and cleaning—in energy-saving initiatives.